1. RAJGHAT POWER
HOUSE
It has installed capacity of
2x67.5=135 MW. Both the units are performing well.
Additional ESPs are being fitted to bring down the
SPM level from 150 mg/NM3 to 50 mg/NM3.
2. GAS
TRIBUNE POWER STATION
It has installed capacity of 270
MW. Due to gas restriction only 4 gas turbines and
2 steam turbines are generally in operation. Two
gas turbines alongwith one steam turbine are kept
on liquid fuel to meet any emergency.
UNDER
PPCL ONE POWER STATION IS IN OPERATION :
PRAGATI
POWER STATION
a) Gas Turbines 2x104 MW (open
cycle)
b) Steam Turbine of 1x122MW (combined cycle)
|